From Bill Schreiber:
Sentinel delivered the Geneseo FPD 101ft. King Cobra
Feb 26
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | Comments off
From Bill Schreiber:
Sentinel delivered the Geneseo FPD 101ft. King Cobra
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, Geneseo Fire Protection District, new tower ladder for Geneseo FPD, Rosenbauer King Cobra tower ladder built for the Geneseo Fire Department
Jan 30
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | 1 Comment
Found at rosenbaueramerica.com:
GENESEO FIRE PROTECTION DISTRICT 75267 – CUSTOM AERIAL KING COBRA
Body/Material EXT Chassis Commander Engine/HP Cummins / 500 Rear Axles Tandem Pump Manufacturer Waterous Pump Model/GPM CSUC20 Pump Control Panel Mid Tank Capacity 535 Electrical System IC Warning Lights Whelen LED
thanks Martin
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, Geneseo Fire Protection District, new tower ladder for Geneseo FPD, Rosenbauer King Cobra tower ladder built for the Geneseo Fire Department
Dec 23
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | Comments off
From Bill Schreiber:
Final Inspection on the Geneseo FPD 101Ft. King Cobra Platform
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, Geneseo Fire Protection District, new tower ladder for Geneseo FPD, Rosenbauer King Cobra tower ladder built for the Geneseo Fire Department
Nov 12
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | 2 Comments
Aug 13
Posted by Admin in Fire Department News, Fire truck being built | 2 Comments
From Bill Schreiber:
Geneseo FPD mid-point inspection on their Rosenbauer King Cobra
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, fire truck being built, Geneseo Fire Protection District, Geneseo FPD orders Rosenbauer King Cobra, new tower ladder fort Geneseo FPD, Rosenbauer King Cobra fire truck being built
Feb 28
Posted by Admin in Fire Service News, Fire Truck photos | 9 Comments
From Rosenbauer Group @RosenbauerAmerica:
Curtains up for the RTXIn recent weeks, Rosenbauer has built the first RTX, the electric tank firefighting vehicle for the North American fire services market. The vehicle is intended for the Los Angeles City Fire Department and was developed jointly with the LAFD. The “core DNA” is identical to the RT according to the European standard, while the technical design complies with the American NFPA (National Fire Protection Agency) regulations. Click HERE for more info and photos
Tags: #BigRedR, #electricfiretruck, #LAFD, #rosenbaueramerica, #RTX, chicagoareafire.com, Los Angles FD Engine 82, Rosenbauer America, Rosenbauer RTX electric fire truck
Feb 25
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | 4 Comments
From Bill Schreiber:
Manhattan FPD Pumper Tender 82 final inspection
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, Manhattan Fire Protection District, Manhattan FPD Tender 82, New pumper/tanker for Manhattan FPD, Rosenbauer America, Rosenbauer Commander pumper/tanker for the Manhattan FPD
Feb 25
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | 2 Comments
This from Bill Schreiber:
Manhattan FPD Rescue Engine 81 final inspection
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, Manhattan Fire Protection District, New engine for the Manhattan FPD, New Rosenbauer Commander EXT pumper for Manhattan FPD Engine 81, Rosenbauer America, Rosenbauer Commander pumper for the Manhattan FPD
Feb 7
Posted by Admin in Fire Department News, Fire truck being built | 2 Comments
From Bill Schreiber:
Geneseo FPD King Cobra chassis
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, fire truck being built, Geneseo Fire Protection District, Geneseo FPD orders Rosenbauer King Cobra, new tower ladder fort Geneseo FPD, Rosenbauer Commander cab being built
Feb 3
Posted by Admin in Apparatus on-scene, Fire Scene photos | 15 Comments
Excerpts from abc7chicago.com:
More than 12 hours after smoke alarms first sounded, firefighters were still battling a massive fire that destroyed a warehouse at the Brewster Creek Business Park in west suburban Bartlett.
The fire was at Access, a secure document storage facility at 1200 Humbracht Circle where the warehouse was stacked floor to ceiling with boxes of documents, providing ample fuel for the fire. What workers said began as a few boxes on fire grew into an inferno.
The trouble began around 10 a.m. when officials said a sprinkler system initially kept the fire in check, but when a series of steel racks being used to store boxes collapsed, there was no saving the warehouse.
In a statement, Access said all its employees evacuated the building and are safe. The company added that it is working with local authorities to determine the cause of the fire.
This from Larry Shapiro:
I responded to the incident around 10:30 a.m. when it was a 2nd Alarm MABAS Box. The MVU was utilized to clear smoke from the warehouse after Bartlett companies had earlier made entry into the building. I mainly photographed the massive amount of apparatus on the scene and they were winding things down releasing everyone but the Bartlett units. At 3:45 p.m. they requested a Box Alarm to the scene for heavy fire.
Tags: #BigRedR, #larryshapiro, #rosenbaueramerica, #Tempest, Bartlett & Countryside Fire Protection District, Bartlett FPD Engine 1, Bartlett FPD Engine 2, document storage warehouse Access destroyed by fire, Larry Shapiro, larryshapiro.tumblr.com, larryshapiroblog.com, MABAS Division 1 MVU, shapirophotography.net, warehouse destroyed by fire in Bartlett, warehouse fire in Bartlett
For the finest department portraits and composites contact Tim Olk or Larry Shapiro.
Arclite theme by digitalnature | powered by WordPress