This from Lucas Hanson
Just passing along a picture (Chris Kochanny photo) of our Engine 2 in production at Pierce. Final inspection is scheduled June 25/26.
This from Lucas Hanson
Just passing along a picture (Chris Kochanny photo) of our Engine 2 in production at Pierce. Final inspection is scheduled June 25/26.
Tags: Bolingbrook Fire Department, Chris Kochanny, fire truck being built, Lucas Hanson, new engine for Bolingbrook, photos of fire truck being built
This entry was posted on June 26, 2014, 1:07 PM and is filed under Fire Department News. You can follow any responses to this entry through RSS 2.0. Both comments and pings are currently closed.
For the finest department portraits and composites contact Tim Olk or Larry Shapiro.
Arclite theme by digitalnature | powered by WordPress