The engine and tower ladder being built by Ferrara for the Algonquin Lake-in-the-Hills Fire Department are moving right along. Updated production photos can be seen HERE showing that the aerial and body have been mounted to the truck chassis and the pumper body is ready to be mounted.
Posts Tagged Allgonquin
Algonquin production updates
Jul 28