This from Keith Grzadziel:
Here is a pic of the construction progress of the replacement for Kenosha Station 4. It is located directly next door to the current station and will be much larger. The admin offices which were previously at Station 4 have been torn down and relocated to their former Station 3.
Also here are a couple of pics of Battalion 1’s new F150 buggy and the “old” Truck 4. I’m not sure where the new Truck 4 is at.Keith
Pingback: Kenosha Fire Department news (more) « chicagoareafire.com
#1 by MABAS 21 on August 28, 2021 - 12:24 PM
Thanks Matt! That makes perfect sense now since the Peter Pirsch plant folded-up in Kenosha
#2 by Matt on August 28, 2021 - 8:06 AM
Sutphen was the Pirsch dealer in Ohio for many years.
#3 by MABAS 21 on August 27, 2021 - 11:14 PM
John, how does Sutphen have a Pirsch connection?
#4 by John on August 27, 2021 - 8:32 PM
John Antkowski Maybe because of the Pirsch connection? At any rate, they’re good rigs.
#5 by John Antkowski on August 27, 2021 - 5:19 PM
They sure like their Stuphens.
#6 by Keith on August 27, 2021 - 3:38 PM
It’s all cinderblock, not prefab.
#7 by Chris S on August 27, 2021 - 1:55 PM
That looks more like a warehouse than a firehouse, prefab walls, there’s no windows