Archive for December, 2013

Waukegan Fire Department history (part 2)

More historical information from the Waukegan Fire Department. This information includes some redundancy from the previous post.

1800’s through 1929

Waukegan, one of the oldest communities in Illinois, can trace its history back to 1673 when Jesuit missionary Father Pierre Marquette and explorer Louis Joliet came upon the tree-covered bluffs in the area along Lake Michigan settled by the Pottawamie Indians.  Trappers and traders followed, building a trading post and stockade in the early 1700’s.  They called it “Petite” or Little Fort.   Eventually the Frenchmen abandoned the fort.  The first permanent settlers came from Chicago in 1835.  The community soon thrived with factories, stores and new residences.  In 1841, Little Fort was named county seat, taking that title from Libertyville.  Between 1841 and 1846, its population had grown from 150 to 750.

By 1849, the town had a population of 2500, and was officially listed as a port with the United States government.   With this growth, “Little” no longer seemed appropriate in its name.  On March 31, 1849, the Village of Little Fort, Illinois changed its name to Waukegan, derived from the Pottawamie term for Little Fort, Waukegance.

Early settlers were attracted to Waukegan because of its port. Produce and grain from Lake and McHenry County farms was shipped via Lake Michigan to Chicago.  The creation of the Illinois Parallel Railroad (now the Chicago and Northwestern) in 1855 brought manufacturing to the city.

A need for fire protection

With the community’s rapid and extensive growth came the need to provide basic services to its residents and businesses.  The town needed fire protection for its warehouses, factories, hotels and the many frame houses that sprung up along its streets.  As such, the first volunteer firemen organized the Waukegan Hook and Ladder Company No. 1 on December 27, 1849.

The new company included 21 volunteer firemen, who manned a small hook and ladder wagon and fought fires with axes and leather and wooden buckets.  The members furnished their own uniforms: the only compensation a volunteer received for being in the company was a rebate of his poll tax.  A 25 cent fee was imposed on anyone who was absent from roll call or from meetings.   Members of the early department were recognized political, business, and social leaders of the community.  The meetings were held at businesses or an establishment owned by one or more of the members until a permanent facility was built in the early 1850’s.

During its first weeks, foreman J.D. Davis led the company: J.H. Hill took over that position on January 7, 1850.  The other officers were E.S.L. Bacheldor, 1st Assistant Foreman; William M. Case, 2nd Assistant Foremen; W.C. Tiffany, Secretary; and William Hallowell, Assistant Secretary. The company fought is first fire on December 11, 1950.  The blaze was at the Kirk foundry, a one-story wooden building at the foot of County Street.

Equipment and facilities were dominant issues in the company’s early history.  On May 3, 1850, a committee was appointed to determine the cost of a fire engine for Waukegan and to find a suitable building to house the Hook and Ladder Company.  Two years later, on October 25, 1852, the city passed an ordinance that authorized the purchase of a fire engine from the City of Chicago as well as the purchase of 300 feet of hose pipe from Charles E. Peck, of Chicago.  This led to the formation of the first engine company.

The Waukegan firemen’s first uniform was adopted on August 11, 1853.  It consisted of red shirts with blue collars and cuffs, blue caps with gilt buttons, and black leather belts. The style of trousers was left up to each fireman.

The first fire engine

The company’s first fire engine turned out to be a disappointment.  The Regular Bucket Brigade #1, after running several trial runs, reported on October 5, 1853 that the engine would not be effective in an emergency. The report recommended that the engine be returned to Chicago.  Waukegan notified the City of Chicago, by way of attorney, that the engine was worthless.  The village directed James Wiseman to put the engine in good order. One year later, on October 20, 1855, Mr. Wiseman returned the engine to Chicago. That city returned to Waukegan the bonds that were used to finance the engine’s purchase.

On March 13, 1854, the village authorized $825 for the purchase of a 32-man power fire engine from L. Button and Company of Waterford.  The engine was delivered, along with a $32.50 bill of freight, on December 14, 1854.  Later that month, the council approved the first payment on the engine of $275, which had been raised by subscription.  At the same meeting on December 30, the  council approved $50 payable to S.W. Dowst for six months rent on a building to house the company.

The first move toward the establishment of a permanent fire facility was made on June 21, 1855, when the village authorized $371 to purchase a lot from Joseph Wallon.  At that same meeting, the council approved a warrant of $450 to give to William H.J. Nichols for the construction of a new firehouse on the lot.  The hook and ladder and engine companies met jointly on April 7, 1856, and W.H. Hill was elected as the company’s Chief Engineer.  In 1858, James S. Barker succeeded Engineer Hill.  Then on January 4, 1859, Horatio James was elected to fill Chief Barker’s un-expired term.

Waukegan took its first step toward becoming a city when on January 23, 1859; the State of Illinois granted the village a special charter.  An election was held on February 23, 1859 to poll the voting residents on the issue.  The results were 407 for incorporation and 122 against. That vote officially made Waukegan a city, with 5.62 square miles.  At the new City Council’s initiatory meeting, it placed the matter of electing the fire company’s chief officers in hands of the firemen.

The city continued to be challenged to provide services and infrastructures to meet the needs of its growing population.  A resolution passed by the board on May 13, 1959 resolved one of those issues.  The resolution required all male residents of the city between the ages of 21 and 50 to furnish three days of labor on the streets and highways.  A person could commute the labor by paying 75 cents for each day.  All fire department volunteers were exempt from the resolution.  This exemption threatened to create a shortage of men to work on roads as more men preferred fire service.  In response, on May 6, 1867, the council moved that, “the committee on fire and water be instructed to confer with the officers of the fire department and urge the importance of reducing the number to the smallest possible number and still not impair its efficiency as the present condition of the roads requires all the poll tax for their repair.”

On April 7, 1860, an ordinance was recommended that would create a fire limit, stating, “No wood building shall hereafter be erected”.  In later years, the City Fire Brigade would insist upon the building of firewalls and brick buildings in the dense downtown to prevent the spread of fire.  On April 9, 1866, the department was divided into three sections: an engine company, a hose company, and a hook and ladder company.  Along with the change came the establishment of the position of Chief Engineer.  C.G. Buell was the first person elected to this post and held it until 1872.

At the January 3, 1870 meeting of the city council, the fire department requested heat for the fire engine house.  The engine and hose were freezing up and could not be used.  In response to increased concerns about the adequacy of the city’s fire protection, the city purchased a Silsby Steam Fire Engine, 250 feet of hose, and a hose cart. According to a later article in the Waukegan Daily Sun. “The engine was brought here and exhibited and tested the latter part of August, 1874, and was accepted Sept. 7, 1874, the consideration being $4,800 for the engine and hose and $300 for the hose cart.”  Unlike the engine purchased a decade earlier, this one stood the test of time.  It was rebuilt in 1892, and was “as capable of doing the same excellent service in 1902 as its initial trial before Waukegan citizens.”  Also in August 1874, the city council settled on the Hogan lots on Washington Street for the location of the new engine house.  On Oct. 5, 1874, the council approved the hiring of William H. Wright as engineer of the Steam Fire Engine at a salary of $125 per year.  Then in January 1875, a new fire company was organized, consisting of nine pump men and fifteen hose men, to operate the old hand engine.

The Great Chicago Fire

The debate over the fire engine did not keep the Waukegan Fire Department from coming to the aid of their brother firemen in Chicago.  On October 8, 1871, residents of Waukegan saw a red glow along the horizon to the south.   Soon after, members of the Waukegan Fire Department received a telegram from firemen in Chicago, asking for help.  Volunteer fireman Fred Palmer, William Sunderline, Patrick Cunningham, William Wright, Harry Kingley, William Yager, George Ludlow, C.B. Kittredge and Phillip Brand took a train to Chicago, arriving at the Northwestern depot to assist the flame-ridden city.  It was also reported that the department sent a cart and 700 feet of hose.

The city was still growing at a rapid pace during the 1870’s.  The city dug artesian wells early in that decade.  In October 1875, the council reviewed a proposal to pipe water from the artesian wells to fire hydrants and to build a water tank to be used for fire fighting.  In June of the following year, the council appropriated $300 for uniforms for the men in Fire Engine Company #1.  On Sept. 7, 1876, the Fire and Water committee authorized the laying of a water main on Genesee Street, south of Washington, to Belvidere Street.  Since there was a surplus of artesian well water, the committee recommended that water mains be provided to all parts of the city as soon as funds became available.

Further steps towards modernizing the department were taken in 1880 when the Fire and Water committee authorized the installation of a telephone to connect the engine house to the city engineer’s residence.  On April 3, 1882, the council authorized the Fire and Water committee to repair the engine house and city lockup. (At the time, the city jail adjoined the engine house.)  In June of that same year, the council approved the building of a 300-barrel cistern in the cellar of the engine house to be used by the Steam Fire Engine.

A paid staff

Even as steps toward modernization were being made, interest among volunteers was waning.  Few attended the annual meeting on January 10, 1882. On April 17, 1882, Chief Engineer Crabtree reported to the council that the fire department companies had disbanded.  The Waukegan Weekly Gazette carried an opinion that “In a city of 5,000 inhabitants there ought to be one or more organized companies. The city has a large number of neat uniforms that ought to be gathered together and only re-distributed when companies have been well organized.” An alderman suggested that a company of ten men be organized to be paid five dollars each whenever called to put out a fire. There were objections to this plan by those who feared that it would cause some men to set fires in order to raise their pay.  As a result, three aldermen were appointed to a committee to develop a plan for re-organization.  The debate continued for the next several years. In 1886 and 1887, significant steps were taken toward the goal of having a paid professional staff. The Chief Engineer was added to the city payroll at $50 a year and ten other firemen received $25 annual salary.

On September 7, 1884, the council had held up a bill to make water records until a map of the water mains and connections could be made. The clerk was instructed to issue water licenses for all parties using the water from the city’s artesian well and have the City Marshal collect the bills.  In 1888, a tax levy was adopted and $3000 allocated to the Fire and Water Committee.

In 1889, Central School was totally destroyed by fire. At its February 4th meeting, the council approved the use of several church basements as temporary schoolrooms. On January 5, 1891, P.W. Cunningham resigned as Chief of the Fire Department and the council approved the nomination of George D. Wordily as Fire Chief. Chief Wardil presented a report at the council meeting of February 2nd, 1891 and asked for approval of a new chemical engine and another Hook and Ladder Truck. The report also asked for 3 full-time firemen and another 5 to 7 men who would be a fixed fee for every fire to which they reported.

Notable historical efforts pertaining to early fire prevention efforts included a request from Dr. Norman J. Roberts on June 1, 1891 to erect a frame building at the southeast corner of State Street (now known as Sheridan Rd.) and Washington Street. The building proposal included a plan to cover the exterior sides and roof with sheet metal, while the inside would be “fireproofed”. The council granted approval. Two weeks later, on June 15, Mr. Robert Dady brought forward a petition to build a frame building that would employ corrugated iron siding with a roof of tar and gravel in order to comply with a new city ordinance on fire proofing buildings.

Recognized for their service

The Waukegan Fire Department was honored for its outstanding service by the Bluff City Fire Company #1, City of Kenosha on April 1, 1892 while battling the fire at the Northwestern Wire Mattress Company, also known as the Simmons factory. In this spectacular fire, the Kenosha Crib Company, the Baldwin Coal Sheds, and four blocks of lumber lying between the Lake Michigan and Kenosha’s Main Street were wiped out. The City of Kenosha bestowed a large hand sewn weighted silk tapestry to WFD commemorating its appreciation for its response to a large fire which required many fire departments from many communities in order to extinguish the blaze.

Following a disastrous fire that destroyed the downtown area in early 1893, the city council employed John A. Cole to prepare plans and specifications for a water plant and distribution system.  On April 6, the council passed a motion to erect a powerhouse for the City Water Works.  Shortly thereafter, it approved the purchase of two water pumps–one high duty and one low duty– each with a 2,000,000-gallon capacity. On Feb. 19, 1894, the council formally adopted the city’s comprehensive water works system.

In 1895, twenty-one fire alarm boxes (numbered 3 through 27) were placed within the city, almost exclusively in the downtown area, including Fireman’s Hall at 115 Madison Street.  That year Aldermen George M. Pedley, John W. Hull, and Ernest C. Alford served on the Fire and Water Committee, which reviewed the operations of the Fire Department.

By 1897, the Waukegan Fire Department continued its growth with the acquisition of a new hook and ladder, hose company, and first class steam fire engine.  The water supply from Lake Michigan was pumped in mains that ranged from six to 19 inches, providing water pressure at the pump of 100 pounds per square inch.  There were 159 fire hydrants and 30 alarm boxes located throughout the city.  The firehouse was equipped with a gong and alarm system which consisted of two circuits, and more than twenty miles of wire with a gong and register in the engine house.  Gongs were also installed in the residences of the chief, assistant chief, and small bells were located in the homes of many of the firemen.  There was also a telephone connection and communication from the street alarm fire boxes, water works, engine house and at the chief’s residence.

A bad year for fires

An 1899 fire at the United States Sugar Refinery caused over $150,000 in damage. However, the most serious fire of 1899 occurred on November 4, 1899 at the American Steel and Wire Company mill with damage reported to be over $500,000 — an incredible sum of money at that time.  A disastrous fire on February 26, 1901 claimed two lives at the Alden Organ Factory.

By 1902, the Fire Department territory included the six miles within the city limits. The alarm system included 33 alarm boxes throughout the city.  The department’s equipment included one Silsby Steam Fire Engine, 1,875 feet of rubber hose, 1,150 feet of cotton hose, one hook and ladder truck carrying 247 feet of ladders, chemical extinguishers, hand pumps and the many minor appliances found “only in the best fire houses”.  Chief Arch MacArthur and Assistant Chief Sars O’Farrel commanded 13 men.

In 1904, from January 12 through 14, Waukegan hosted the annual convention of the Illinois Firemen’s Association.  Chief Sars O’Farell, and his command staff including Assistant Chief D.G. Hutton, Foreman Richard Drew, and Assistant Foreman O. Stanley organized and hosted the convention.  Other department members who were organized and were delegates to the convention were:  O. Stanley, Chris Conners, David Gibson, J.H. Jansen, J. Balz, A. Murray, Gene Hicks, Ed Webb (substitute) and Charles Jackson (substitute).

The fire alarm system was expanded to include 75 boxes. Alarms transmitted through the Illinois Bell telephone company lines and two-way radios in the fire apparatus greatly facilitated this change.  These alarm boxes continued in service until 1952.

Reduced fire loss

On June 1, 1906, Sars O’Farrell, in his capacity as Fire Marshal, made his annual report to the City Council and Mayor.  For that year, the department had 66 alarms, with a total fire loss of $3745, which was a significant reduction of the previous year’s loss of $9321.  Mr. O’Farrell reported that “Cap” the truck horse was in bad shape and recommended the purchase of a new team of horses and a concurrent steamer.  Other points raised in the report included mention of the new bath tub added to the fire station, the need for stricter fire ordinances to address unsafe building construction methods, the near-collision of fire equipment with the city’s street cars due to the street cars’ unsafe operation, and a request to limit the use of fire hydrants by only fire department personnel.

First Waukegan LODD

The North Shore Electric Plant Fire (located on Spring Street across from the Northwestern Train Depot) occurred on April 23, 1908. The fire caused a giant flywheel to break from its bearings, which resulted in the death of Fireman John Hobart Jansen.  Mr. Jansen was the first member of the Waukegan Fire Department to die in the line of duty since the department was founded in 1849. Fireman Jansen left a wife and four children at the time of his passing.

Merchant Policeman Joe Paddock also died in that fire. Fireman Balz and Captain Gibson narrowly escaped death or serious injury as they were near Fireman Jansen who was operating a hose line at the blaze when the explosion took place. Beyond his duties as a fireman, Mr. Jansen was also the manager of the Waukegan Telephone Exchange

On July 26, 1910, Fire Marshal Sars O’Farrell reported that the loss from a fire at Thomas Brass and Iron Company fire was $122,657, a substantial loss for that time. Also lost at the fire was the neighboring Durand Steel Locker Company.

Local newspapers were instrumental in recording the fire department’s history. The year 1911 saw the WFD as the topic for numerous articles.  On Jan. 7, Mr. L.O. Wainwright complemented the fire department its excellent work while battling a blaze at his factory on Chestnut Street. On March 24, 1911, the paper reported on the groundbreaking for the new fire station at South Avenue and McAlister Street. A March 29th fire gutted the J.H. Norlander building at 1112 McAlister Street, which housed a butcher shop and a grocery store. A fire in the Larsen building on North Genesee Street, which started in the basement, resulted in $35,000 in damages.  Fireman Joe McLick, who also worked at the wire mill, was injured while performing axe work at that blaze. Waukegan’s Commissioner of public property, Mr. Elmer V. Ortis reported to the Waukegan Daily Gazette on May 23, 1911 that he had received numerous offers to trade land for the site of the new Central Fire Station. On May 18, 1911, the Gazette reported that Chiefs Hutton and O’Farrell had tapped firemen Gray and Webb as the new Captains of the Southside and Central Fire Stations. On May 31, 1911, the Gazette reported that the Chief of Police had offered a $10 reward for information leading to the arrest of a false alarm “fiend” which caused the fire department to respond to six false alarms from designated fire alarm boxes over a six day period. Chief Sars O’Farrell confirmed the mischievous behavior.

The first motor driven fire engine sped over some of Waukegan’s unpaved streets in 1912 sometimes having to utilize chains on hard rubber tires to navigate snowy and muddy roadways.

The Central Fire Station was remodeled that same year, and officially dedicated on January 27, 1913.  It had developed into a social center for the community.  Residents gathered to watch the firemen respond to alarms.

Manufacturers Terminal burned on May 2, 1918. As a result of the damages caused by this fire, the federal government demanded that the city develop a fire protection system.

As reported in the Waukegan Daily Sun, Fireman Julius E. Schoenke died from pneumonia on May 3, 1928 after a very lengthy hospitalization.  He was 34 when he died. Three years earlier, Fireman Schoenke had sustained a fractured leg when he was thrown from his fire truck in an accident at Belvidere and Genesee Street. Fireman Schoenke was a 10-year veteran of the department. His wife, the former Signe Moberg, was a maternal aunt to a one of Waukegan’s more famous natives, the writer Ray Bradbury.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tags: , , , , , ,

Down memory lane … suburban departments

This from Martin Nowak:

Thanks to Squad546 for allowing me to use his photos. Thought it was time to go back in time,

Matteson Fire Department history

Matteson, former Snorkel 5-1967 Pierce/FWD 75′. Squad546 phot

Elk Grove Village Fire Department history

Former Elk Grove Engine 117-1971 Mack. Squad 546 photo

Forest Park Fire Department history

Former Forest Park Engine 2-1968 FWD. Squad546 photo

Dolton FIre Department history

Former Dolton Truck 1442-1981 Pierce/Oshkosh 75′ TeleSqurt. Squad546 photo

Elwood Fire Protection District history

Former Elwood Fire Protection District Truck 619-1980 Pemfab Wedge/E-ONE/75′ Tele Squrt quint. Squad546 photo

York Center Fire Protection District history

Former York Center Fire Protection District, Engine 76-1982 Spartan/1992 E-One 1500/3000. (Lombard). Squad546 photo

Tags: , , , , , , , , , , , ,

Waukegan Fire Department history (part 1)

The Waukegan Fire Department shared their history with us for the website. Here is the first installment:

The History of Waukegan Fire

1849               The first Hook and Ladder Company was formed in Little Fort although it wasn’t empowered to become a village by the General Assembly until February 12, 1849.  On March 31, 1849 the citizens voted to change the name from Little Fort to Waukegan.  The first village organization was also selected on March 31, 1849, with D. O. Dickenson as President.

 

1850               May 3rd, 1850 a committee was appointed to determine the cost of a fire engine for Waukegan and to seek a suitable building to house the Hook and Ladder Company from the weather.

 

1852               On November 18, 1852, the village board authorized the executive a bond for purchase of a fire engine from the City of Chicago.  They also ordered 300 ft. of hose pipe from Charles E. Peck of Chicago.

 

1853               October 5, 1853, a committee of the Fire Co. Regular Bucket Brigade #1 said that several trial runs had been made with the new fire engine and the new fire engine would not be effective in an emergency and thought that the fire engine should be abandoned.  The village board authorized an attorney to notify the City of Chicago of the worthlessness of the machine.

 

1854               On March 13, 1854, the village decided to buy a new fire engine from L. Button & Co. of Waterford for $825.00.  It was a 32-man power machine.  The December 14, 1854 meeting approved a bill of $32.50 for payment of freight on the new fire engine.

 

The December 30, 1854 meeting approved $50.00 for the first six (6) months rent of a building owned by S.W. Dowst.  The same meeting approved the first payment of $275.00, raised by subscription, for the new fire engine.

 

1855               The June 21, 1855 meeting approved an expenditure of $371.00 to buy a lot from Joseph Wallon to build a firehouse.  The village board also directed James Wiseman to clean up the old (useless) fire engine, put the same in good order, and take the engine to Chicago whenever directed by the city attorney.

 

The same meeting also approved a warrant of $450.00 to Wm. H.J. Nichols for construction of the new firehouse.  On October 20, 1855, James Wiseman reported the delivery of the old fire engine to the City of Chicago.  Chicago accepted the engine and returned the city’s bonds.

 

1859                      On May 13, 1859, the board passed a resolution that all male residents of the city, over 21 and under 50 years, and not exempt by the charter, be required to furnish three (3) days of labor on the streets and highways of the city.  The person could commute for such labor by paying 75 cents for each day.  (All volunteers on the fire department were exempt).

 

On June 23, 1859, the State of Illinois granted the City of Waukegan a special charter.  This was followed by an election to incorporate the City of Waukegan.  The election was held on February 23, 1859 with 529 persons voting.  The results were 407 for the charter and 122 against.

 

1860               On April 7, 1860, an ordinance was recommended to create a fire limit, within which no wood building shall hereafter be erected.

 

In later years, the City Fire Brigade always insisted upon the building of brick buildings with fire walls, in the dense downtown area, so fires could not spread easily.

 

1870                      On the January 3, 1870 meeting, the Fire Department requested heat for the Fire Engine House, because the fire engine and hose were freezing up and couldn’t be used

 

The August 18, 1874 meeting approved the purchase of a Selsby Steam Fire Engine and a hose cart.  The hose cart to cost $300.00.

 

1874               A special session of the Council on August 21, 1874 authorized the Fire and Water Committee to obtain proposals for the purchase of a lot on which to build an engine house.

The committee recommended the purchase of the Arnold Lot, 25 ft. by 132 ft., with a 12 ft. alley on the north side of the lot for a price of $1,180.00 (location not shown, but on Block 25).

 

The September 9th meeting, on presentation of a petition to protect the purchase of the Arnold lot on Block 25 and asking for the engine house to be located on the Hogan lots on Washington Street – the council rescinded its action to purchase Arnold’s lot.

 

On the same date, the bill for the purchase of the Silsby Fire Engine (Steam) 250 ft. of rubber hose and one hose carriage all for $4,800.00, was approved.

 

The October 5th, 1874 meeting approved the hiring of William H. Wright as Engineer of the Steam Fire Engine at a salary of $125.00 per year.

 

1875               The October 2nd meeting concerned a letter in regard to the use of water from the new artesian well, the piping of the water to fire hydrants and the building of a tank for the water to be used for fire purposes.

 

1876               The June 9th meeting authorized $300.00 for purchase of uniforms for Fire Engine Co. #1.

 

The September 7th meeting authorized, by the Fire and Water Committee the laying of a water main, South of Washington Street, on Genesee Street to Belvidere Street for the residents of the Southside.  Since the artesian well has a surplus of water it is advised to furnish water mains to all parts of the City when funds are available.

 

At the October 2nd meeting the Fire and Water Committee was authorized to hire an engineer for the maintenance of the City Steam Fire Engine.

 

The engineer Wm. H. Wright was hired by authorization of the December 4th meeting at a salary of $125.00 per year.

 

1880               At the June 5th meeting the Fire and Water Committee was authorized to install a telephone connecting the Engine House with the residence of the City Engineer.

 

1882               The June 2nd meeting authorized a cistern to be built in the cellar of the Engine House to be used by the Steam Fire Engine.  The cistern to have a capacity of 300 barrels.

 

On April 3rd the council authorized the committee on Fire and Water to repair the bad condition (?) of the Engine House and the Lockup  (At this time the City Lockup (jail) adjoined the Engine House).

 

1884               The September 7th meeting held up a bill for making water records until a map of water mains and connections could be made.  The clerk was instructed to make out water licenses for all parties using water from city’s artesian well and have the City Marshall collect the bills.

 

1888               The tax levy was adopted and $3,000.00 was allocated for Fire and Water.

 

1889               Central School was totally destroyed by fire and the February 4th meeting asked approval for the use of several church basements for the various grades of the schools.

 

1891               P. W. Cunningham resigned as chief of the Fire Department on January 5th and the council approved the nomination of George D. Wardil as Fire Chief.

 

The February 2nd meeting heard a report of the new Fire Chief voting the worthless condition of the Fire Department and the need for a new chemical engine and another hook and ladder truck.  It also asked for three (3) fulltime firemen and another 5 or 7 men to be paid for actual work – a fixed sum for every fire.

 

On June 1st the council heard a communication from Dr. Norman J. Roberts requesting permission to erect a frame building at the southeast corner of State Street and Washington Street.  (State Street is now Sheridan Road) the said building to be covered on sides and roof with sheet steel and the inside would be fireproofed after the best methods of fire proofing wood frame buildings was then read.  Permission OK’d.

 

1891               The June 15th meeting heard a petition from Robert Dady requesting the privilege to build a frame building that would be sided with corrugated iron.  The roof would have the same material or tar and graveled to make it conform to a new city ordinance on fire proofing buildings.

 

(This building is still standing, just south of the Waukegan building.  I think it was one of the buildings written about in Bradburys Dande-lion Wine in which the Lonely.  One frustrated the police).

 

1892               The June 27th meeting agreed to employ John A. Cole to prepare plans and specifications for a water plant and system for procuring water directly from the lake.

 

1893                      The April 6th meeting discussed and passed a motion to erect a Power House for the City Water Works as designated by the previous water ordinance.  And on April 11th the council voted to have water pumps with a capacity of 2,000,000 gallons each – one high duty and one low duty.  On the evening of August 22nd, during a fire in block 12, one residence of 128 Madison Street was partially torn down to prevent the spread of a fire next door.  On September 18th the council approved a partial payment of $140.00 to owner of the house.

 

1894               An ordinance was adopted on February 19th for the city’s water works systems.

 

1912               In 1912 the Central Fire Station was remodeled.

 

1918               Manufacturers Terminal burns resulting in demand by U.S. Government to their fire protection system.

 

 

Tags: , ,

Franklin Park Fire Department apparatus history (part 2)

Harry Pederson submitted a number of images chronicling the current and recent past apparatus of the Franklin Park Fire Department. This is part 2 from Harry showing engines. Previously we posted part 1 that featured ambulances.

Part 2 shows fire suppression rigs

Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus Franklin Park Fire Department apparatus

 

 

Tags: , , , , , ,

Down memory lane … North Maine FPD

These images are from the archives of Steve Redick

North Maine Fire Protection history

Steve Redick photo

North Maine Fire Protection history

Steve Redick photo

North Maine Fire Protection history

Steve Redick photo

North Maine Fire Protection history

Steve Redick photo

Tags: , , , , , , ,

CPD and CFD assaulted on-scene

ABC7 has an article about an alleged assault of two CFD paramedics and a CPD officer:

Two paramedics and a Chicago police officer were injured when prosecutors say the man they were called to help assaulted them Tuesday night in the city’s River North neighborhood.

All three … were sent to the hospital. The suspect was sent to court. None of the injuries were life threatening. The paramedics and police officer were released Tuesday night. The suspect, who was treated for injuries as well, was in court Wednesday. Also in court were fellow paramedics and firefighters frustrated by violence first responders sometimes face.

A call for [an] injured man came from this block Tuesday evening on North LaSalle. Two Chicago paramedics responded. They were evaluating him and they say something happened.

“It was an average run and nothing out of the ordinary. It’s almost like flipped a switch and the gentleman became combative and that was the result three people hospitalized,” said Asst. Deputy Chief Jeff Larson, Chicago Fire Department.

The 28-year-old delivery driver from Indiana appeared in court Wednesday. Joseph Zajac is charged with aggravated battery of the paramedics and a Chicago police officer.

Prosecutor said Zajac hit a 63-year-old paramedic and a Chicago police officer who responded to help the paramedics. The second paramedic was injured. Prosecutors say she ended up with a concussion.

“They are sore, they are beaten up. And they’re exhausted at this point. All they want to do is get some rest and be with their family,” said Tom Ryan, president, Chicago Firefighters Union.

The president of the union representing the paramedics says he’s gone to court five times in just two weeks for suspects charged with assaulting paramedics on the job.

“This is insanity, this should never happen, much less with the frequency that it is happening and I hope the citizens of this city are as outraged as we are,” said Ryan.

In the last two years in Cook County, more than sixty people have been charged for assaulting a paramedic.

 

Tags: , , , , ,

Video: Chicago Firefighter Saved by MSA PASS Device

Chris Ranck found this video about an MSA PASS device saving a Chicago firefighter

Tags: , , , ,

Oak Park buys tower ladder

Dan McInerney provided the following information about the new tower ladder that is being purchased by Oak Park.

The OPFD recently opted to purchase a new truck. The bidder that was selected was E-One. The type of truck selected was a 95′ platform on a low profile chassis. The low profile chassis is needed due to numerous viaducts with low clearance issues. Also making a return to the OPFD is a truck without a pump. The main reasons we chose no pump is to cut down on cost and complexity, be able to carry more equipment, and due to a recent ISO grading that showed us we no longer needed an aerial ladder with a pump. The compartment space that will be added due to the new configuration will more than double the amount of space we currently have.

E-One was able to meet our height restrictions by lowering the height of the ladder when bedded. If you look closely in the drawing and picture, you will see that the cab is a normal sized Cyclone, but the waterway is nestled in a cutout of the roof of the cab. There is approximately 4-5 inches of dead space in between the top of the roof and cab ceiling where insulation, wires, radio stuff, etc. would go. Another big concern was the amount of forward visibility that was lost with other low profile designs.There were three other manufacturers that bid – Rosenbauer, Ferrara, and Spartan ERV – all three of them had forward visibility issues with their low profile designs.

Another point of contention with the 95′ model is we would loose several feet of vertical reach from what we currently have. Those concerns were put aside when we compared an E-One 95′ vs. 100′. The 100′ has a larger outrigger spread compared to the 95′, and in all, we would only loose a little over 2 feet of reach if both were set up at the same spot.

The attached picture of a low profile 100′ was sent to us by E-One for a customer whose agency escapes me at the moment. Our rig will have no pump and roll-up doors throughout, except in a spot over the rear duals where a roll up door would be impractical. In this picture you can really see the bottom of the platform affects only the top portion of forward visibility.

E-ONE low profile tower ladder

E-ONE 95′ rear-mount tower ladder on a Cyclone chassis with a notched cab roof. E-ONE photo

drawing of new fire truck for Oak Park IL drawing of new fire truck for Oak Park IL

Tags: , , , ,

NIOSH report released on LODD of CFD Captain Herbie Johnson (more)

The Chicago Tribune has an article about the NIOSH Report on the LODD of CFD Captain Herbie Johnson:

Chicago firefighters failed to properly coordinate and communicate their strategy for extinguishing a blaze that killed a 32-year veteran of the department last year, a federal investigation found.

The report marks the second time in as many years that the National Institute for Occupational Safety and Health has cited poor communications as a contributing factor in a Chicago firefighter’s death. Though not as scathing as the findings from a December 2010 blaze that killed two firefighters, the latest NIOSH report indicates there are still questions about how the department communicates while battling fires.

The report also describes the harrowing scene inside a burning Gage Park neighborhood two-flat on Nov. 2, 2012, where Capt. Herbert Johnson repeatedly ordered his men to safety after suffering severe burns to his hands, face and the inside of his mouth.

“He was trying to get us out but he couldn’t get himself out,” said firefighter-paramedic Mike Imparato, who yelled “mayday” — he had no radio — after Johnson fell to the floor.

Both the Fire Department and the firefighters union have reviewed the report, which does not specifically state which, if any, issues had a direct bearing on Johnson’s death. Instead it lists a series of “contributing factors” that include poor communication, staffing shortages and inefficient coordination at the scene.

A union official said the report, while an important learning tool, also shows that fires are filled with hidden dangers beyond anyone’s control.

“They got on the scene and there was minimal fire showing from the first hole in the roof,” said Thomas Ryan, president of Chicago Fire Fighters Union Local 2. “It looked as though they had it under control, then all hell broke loose. Johnson’s first instinct was to tell the members to get out. He looked out for the safety of his fellow firefighters. Unfortunately he didn’t make it out.”

Johnson, who had been promoted to captain that summer, was in the house for only six minutes when things went terribly wrong, according to investigators. As Johnson carried a hose inside, the scene commander announced over department radios that other firefighters were ventilating the building and blasting water into the attic.

Johnson, who was carrying a radio, never confirmed that he got that message. But the plan proceeded anyway. The report specifically chastises scene commanders for failing to confirm that Johnson knew the plan to attack the fire.

“Everyone has to know the strategy that is being implemented and understand their role by acknowledging via radio their position and role,” the report states.

The federal investigators also took issue with the strategy employed that day, saying that firefighters on the scene failed to consider that horizontal ventilation — doors were opened on either end of the building, and there was a hole in the roof — would cause the fire and heat to intensify and become dangerous, federal investigators said.

Around the same time as the ventilation plan was enacted, Johnson ordered firefighters on the second floor to get out of the building. His order was followed by a loud noise, as Johnson collapsed on the second floor.

The report confirms that the firefighter-paramedic who found Johnson did not have a radio and was reduced to screaming “mayday” to call attention to Johnson’s injuries, according to federal investigators. The report notes that on the day of the fire the city was still awaiting a shipment that would have provided a radio to every member of the department.

Those additional radios were recommended by NIOSH after an investigation into a December 2010 fire in a vacant South Side building that killed two firefighters. The lack of radios was cited as a contributing factor in that blaze.

Chicago Fire Department spokesman Larry Langford on Monday initially insisted that all firefighters involved in the Gage Park fire had radios. After reading the report Monday, he conceded that some firefighters at the scene did not have radios but said it would have made little difference.

“That had nothing to do with this incident,” Langford said. “Communication was not the issue in this incident from what I determined.”

Every Chicago firefighter now has a digital radio, Langford said. Most were distributed on Nov. 18, 2012, about two weeks after Johnson’s death.

Imparato, who made the mayday call without a radio, told the Tribune he yelled for about 10 seconds before help arrived. He tried to grab Johnson’s radio to call for assistance but couldn’t reach it, he said.

“Ten seconds seemed like an eternity,” he said. “I could hear footsteps on the stairs, so I knew others were coming. I was screaming ‘mayday’ the entire time.”

Imparato said he doesn’t believe a radio would have changed Johnson’s fate.

Tags: , , , , ,

DuPage County fire department numbering (more)

As a response to a recent post about the numbering of fire stations in DuPage County, a reader submitted the following information:

DUCOM Numbering system DUCOM Numbering system

Tags: , , , ,