More from Tim Olk at the large mulch fire in McCook, this is Day 4 as the private contractor works for the second straight day to knock this down.

Tim Olk photo

Tim Olk photo

Tim Olk photo

Tim Olk photo
More from Tim Olk at the large mulch fire in McCook, this is Day 4 as the private contractor works for the second straight day to knock this down.

Tim Olk photo

Tim Olk photo

Tim Olk photo

Tim Olk photo
Tags: firemen fight to extinguish mulch fire with large master streams, large mulch fire burns for days, large mulch fire in McCook, McCook Fire Department, private contractor takes over extinguishment of large mulch fire, Tim Olk
Tim Olk visited the large mulch fire which has been burning since Saturday (12-28-13) at 5300 Lawndale in McCook. Tim reports that companies were there again today and that a private contractor has been hired to mitigate the fire.

Tim Olk photo

Tim Olk photo

Tim Olk photo

Tim Olk photo

Tim Olk photo

Tim Olk photo
Tags: firemen fight to extinguish mulch fire with large master streams, large mulch fire burns for days, large mulch fire in McCook, McCook Fire Department, Tim Olk
Dec 29
Posted by Admin in Fire Scene photos, Fire Truck photos | Comments off
This from Josh Boyajian:
Here are some of my pictures of the new 6-7-6 flowing water in McCook at their mulch fire.

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Josh Boyajian photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Josh Boyajian photoCFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Josh Boyajian photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Josh Boyajian photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Josh Boyajian photo

McCook engine at the scene. Josh Boyajian photo

Josh Boyajian photo
Tags: Chicago Fire Department deluge wagon 6-7-6, Chicago Turret Wagon 6-7-6, firemen fight to extinguish mulch fire with large master streams, Josh Boyajian, large mulch fire in McCook, McCook Fire Department
Dec 28
Posted by Admin in Apparatus on-scene, Fire | 8 Comments
The McCook Fire Department has been working a large mulch fire since 8AM at 5300 Lawndale. For much of the day they used a tanker shuttle to provide water. The fire is burning on the back side of a huge mulch pile where there is no access.
Late this afternoon, they released the tankers and requested a hose wagon (6-1-2) and turret wagon (6-7-6) from Chicago. The new 6-7-6 is on the scene at what is believed to be the first deployment of the new unit.
Several contributors are or have been at the scene. Several cell phone images have been submitted from Josh Boyajian and Tim Olk, and we look forward to more images later tonight. This will be an extended operation.

Josh Boyajian photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Tim Olk photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Tim Olk photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Tim Olk photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Tim Olk photo

CFD Turret Wagon 6-7-6 works at a large mulch pile fire in McCook. Tim Olk photo

Josh Boyajian photo
Tags: Chicago Fire Department deluge wagon 6-7-6, Chicago Turret Wagon 6-7-6, first deployment of new turret wagon in Chicago, Josh Boyajian, large mulch fire in McCook, McCook Fire Department, Tim Olk

For the finest department portraits and composites contact Tim Olk or Larry Shapiro.
Arclite theme by digitalnature | powered by WordPress