Found at govdeals.com:
Brush Truck Skid Unit with 250-Gallon Poly tank
thanks Martin
Aug 16
Posted by Admin in Fire Department News | 2 Comments
Aug 16
Posted by Admin in Fire Department News, fire engine for sale | 2 Comments
Found at govdeals.com:
1998 Pierce Saber fire engine
1998 Pierce Saber Tilt Cab Auction Ends 9/12/22 12:27 PM ET Remaining 27 Days 17 Hrs This item is subject to an auto
extension of the auction end time.Refresh Bid & Time Tax See Payment Instructions Buyer’s Premium 12.50% Starting Bid $1,000.00 Bid Increment $25.00 Minimum Bid $1,000.00 1998 Pierce fire engine, 8.7L L6 Detroit Diesel.,Allison MD3060R Auto transmission with retarder, Waterous CMUYCX 1500-GPM two-stage pump, Elkhart 240-P foam system pre piped to rear cross lay and deluge gun, 1000-gallon Poly water tank with 35-gallon internal foam tank, 2- 1 1/2″ cross lays, 2- 2 1/2″ D/S discharges, 1- 4″ P/S discharge, 1- 2 1/2″ P/S discharge, 1- 2 1/2″ rear discharge, 1- 6″ front intake, 1- 6″ D/S intake, 1- 6″ P/S intake
Generac 7.5 kw diesel generator, 200″ electric cord reel, 2 500-watt scene lights
148,426 miles
thanks Martin
Tags: 1998 Pierce Saber fire engine for sale, Lake Zurich Fire Department, Lake Zurich fire engine for sale
Aug 15
Posted by Admin in Fire Department News | Comments off
From the Prospect Heights Fire Protection District:
Battalion Chief Recruitment
Currently the PHFD has one shift without a battalion chief. Under the recently adopted collective bargaining agreement the fire chief is entrusted to appoint the battalion chief. The PHFD has fewer candidates for battalion chief than desired as a result of several
personnel actions in the past few years that included the PHFD’s transition from some part time officers to all full time officers and an increase in the number of full time firefighter/paramedics. Therefore, the PHFD is conducting a search for external candidates for battalion chief. Any identified external candidates will be evaluated with the internal candidates in an effort to identify the best candidate for battalion chief. It is anticipated that the review, selection, and appointment will occur in the next 90 days.
Link to Complete Recruitment Document and How to Apply
Tags: Prospect Heights Fire Protection District, Prospect Heights Fire Protection District seeking candidates for Battalion Chief
Aug 14
Posted by Admin in Ambulance for sale, Fire Department News | Comments off
Found on eBay:
2008 International 4300 / Medtec Ambulance
(Bidding has ended on this item.)
Up for auction is a 2008 International 4300 / MedTec Ambulance. It was purchased new by the Village of Clarendon Hills and used as a full active service ambulance by the Clarendon Hills FD until early 2015. It was then taken out of full active service in 2015, placed in reserve status through July 2022 and only used when our newer ambulance was out of service for maintenance and/or repairs. This vehicle has a valid safety lane sticker dated 8/22.International4300
Motor: International MaxxForce DT [Original motor]
Transmission:Allison [Original unit]
Air Suspension with rear dump
51 Gallon Diesel fuel tank under passenger step
thanks Martin
Tags: ambulance for sale, Clarendon Hills ambulance for sale, Clarendon Hills Fire Department
Excerpts from bookclubchicago.org:
Police and firefighters will conduct training exercises in a mock neighborhood at the Joint Public Safety Training Campus on the West Side, raising the total cost of the project to $128 million.
Construction on the $33 million, state-of-the-art tactical scenario village used for police and fire training will include a fake city block, a six-story burn tower, a car crash rescue area, and other settings and props to simulate real-life emergencies. Construction is scheduled to begin this summer.
Construction on Phase 1 of the training campus at 4301 W. Chicago Ave. is nearly complete, and includes a building with classrooms, administrative offices, and an auditorium.
Renderings for the tactical village show a typical neighborhood block in Chicago, including multiple two- and three-flat residential brick buildings complete with fences, curbs, sidewalks and yards. Each building will have back stairways, porches and a two-car garage. One will have a basement. An alley with mock dumpsters will separate those buildings from a multi-story structure with shops and businesses on the ground floor plus apartments above.
The $33 million price tag for the mini city scenario village is in addition to the $95 million cost of the rest of the Joint Public Safety Training Campus, bringing the total cost of the project $128 million. The Public Building Commission increased the budget for this portion of the project from $20 to $33 million in September 2021 without community input or opposition.
Despite facing strong opposition from activists and organizations like No Cop Academy when it was announced five years ago, City Council approved plans for the new West Side cop and fire academy in 2019. Instead of pouring more money into the police budget, activists wanted city hall to spend the money on housing, social services, and schools to address root causes of violence. Those organizers are now drawing parallels between Chicago’s scenario village and a $90 million safety training center set to begin construction in Atlanta, which is facing fierce public opposition.
Officials have defended the academy, saying it will play an important role in training officers and recruits so they’re better able to respond to emergencies.
The campus will allow the police department to strengthen collaboration with fellow public safety partners and continue enhancing training for officers. “This facility will also provide [the Police Department] with the tools and resources needed for modern, 21st-century policing based on national best practices.”
Police and fire personnel currently train at seven different locations throughout Chicago’s city limits, including a vacant Chicago public high school in South Shore that the city leases for $1 a year from the board of education. The police also train in a residential building called a “Safe Entry training home” across the street from the main police academy at 1300 W. Jackson Blvd. Each of the seven training locations are slated to close once the new campus opens.
Construction on the mock tactical buildings is scheduled to be completed by the end of 2022. The residential-style buildings will not have water or gas service, and the interiors will be stage sets.
Besides the neighborhood block part of the village, there will be a six-story burn tower, a multi-story mixed-use live fire building, a haz-mat transportation area, a rail prop area, a car crash rescue area, and a driver training course.
A two-story technical rescue prop is designed to resemble a collapsed parking structure or train station. The rescue prop will have a series of angled and partially broken slabs of concrete with sacrificial panels meant to be removed and put back in place. It will have a series of vaults and pipes to create confined space training opportunities for firefighters and will serve as a training scenario for parking garage incidents, confined spaces, trench rescue, and collapsed building rescue.
Current and future firefighters will train in a live-fire commercial training tower meant to simulate high-rise and low-rise scenarios. Mounted to the top of the structure will be heavy-duty, bomb-proof anchors for tying off ropes for rappelling and other training exercises. There will also be a dedicated area for training on how to respond to car crashes and provide emergency medical treatment during extrications.
The live-fire buildings, driver training course and rescue prop areas are expected to be finished by early 2023.
thanks Dennis
Tags: Chicago Fire Department, chicagoareafire.com, Chicagoareafire.com/blog, Joint Public Safety Training Campus, new public safety training campus in West Garfield Park, No Cop Academy
Aug 13
Posted by Admin in Fire Department News, Fire truck being built | 2 Comments
From Bill Schreiber:
Geneseo FPD mid-point inspection on their Rosenbauer King Cobra
Tags: #BigRedR, #firetruck, #rosenbaueramerica, chicagoareafire.com, Chicagoareafire.com/blog, fire truck being built, Geneseo Fire Protection District, Geneseo FPD orders Rosenbauer King Cobra, new tower ladder fort Geneseo FPD, Rosenbauer King Cobra fire truck being built
Aug 13
Posted by Admin in Fire Department News, New Apparatus Order | 4 Comments
thanks Josh & Martin
Tags: chicagoareafire.com, Cicero Fire Department, Legacy Fire Apparatus, new engine for Cicero, Sutphen fire engine
Aug 12
Posted by Admin in Fire Department News, Fire Truck photos, New Delivery | 2 Comments
This from Larry Shapiro:
Algonquin-Lake in the Hills Fire District Engine 143 was at the 2-Alarm fire in Barrington Hills on 8/11/22.
Tags: #larryshapiro, Algonquin-Lake in the Hills FD Engine 143, Algonquin-Lake in the Hills Fire District, chicagoareafire.com, Chicagoareafire.com/blog, Larry Shapiro, larryshapiro.tumblr.com, larryshapiroblog.com, New engine for Algonquin-Lake in the Hills Fire District, Pierce Enforcer PUC fire engine, shapirophotography.net
Aug 12
Posted by Admin in Ambulance photos, Fire Department News, New Delivery | 6 Comments
From FosterCoach.com;
thanks Martin
Tags: ambulance photos, chicagoareafire.com, Foster Coach Sales, Horton Type 1 ambulance, Mundelein FIre Department, new ambulance for Mundelein
You are currently browsing the archives for the Fire Department News category.
For the finest department portraits and composites contact Tim Olk or Larry Shapiro.
Arclite theme by digitalnature | powered by WordPress