From the Fire Service, In. Facebook page:
Final inspection of Joliet Engine 1 at E-ONE.
From the Fire Service, In. Facebook page:
Final inspection of Joliet Engine 1 at E-ONE.
Tags: chicagoareafire.com, fire engine being built, fire engine being built for the Joliet FD, Joliet Fire Department, new engines for Joliet
This entry was posted on October 17, 2019, 10:56 AM and is filed under Fire truck being built. You can follow any responses to this entry through RSS 2.0. Both comments and pings are currently closed.
For the finest department portraits and composites contact Tim Olk or Larry Shapiro.
Arclite theme by digitalnature | powered by WordPress
#1 by Big Moe on October 18, 2019 - 8:29 AM
Great looking rig. I agree with the Hi-Viz lighting. We did that on our last new rig in ’17. Best looking rig in the city.
#2 by Jim S on October 18, 2019 - 8:21 AM
Joliet got two new (Emergency One) engines for E8 and E9 back in 2015.
#3 by harry on October 17, 2019 - 9:10 PM
I am very sure it was like 2014 or 15 because that was the last time I was in Joliet and I was temped to get a picture of the new rig but they are not a friendly city some of the cops I have met there were nice a few at public works but no one at fd
#4 by Michael m on October 17, 2019 - 5:25 PM
Sharp looking engine! I am sure it will serve them well!
When was the last time they bought new engines? Was is 2008-2009?
#5 by Zach Cox on October 17, 2019 - 3:38 PM
Look at all those HiViz lights!!! The BEST!