updated production photos of the new squad for Schaumburg from Josh Boyajian while visiting the Pierce plant

Josh Boyajian photo

Josh Boyajian photo

Josh Boyajian photo

Josh Boyajian photo

Josh Boyajian photo

Josh Boyajian photo

Josh Boyajian photo

Josh Boyajian photo
Pingback: New squad for Schaumburg (more) « chicagoareafire.com
#1 by harry on December 6, 2017 - 3:48 PM
well squad 7 at ohare was bout this big but it did not carry water and the sqd that mount horeb wi had it is gone now it had a 1000 gallon water tank
#2 by Tyler Tobolt on December 6, 2017 - 11:40 AM
Michael M, It will be delivered later December / Early January from what i’ve been told.
#3 by Sebastian on December 6, 2017 - 5:19 AM
This thing is a BEAST!!!!!! Don’t think i’ve ever seen a squad thi. Big and carry watert at the same time!!!
#4 by FFPMTom on December 5, 2017 - 10:23 PM
That’s a damn sharp looking rig
#5 by Mike C on December 5, 2017 - 7:35 PM
I’m digging the steel wheels! I think LED headlights would compliment this rig well!
#6 by Josh on December 5, 2017 - 4:20 PM
Jim, the new squad carries 500 gallons of water. Also the rear hose compliment has two beds of 2.5” and 1 bed of 1.75” preconnect. There is no LDH coming off the back.
#7 by Jim on December 5, 2017 - 1:45 PM
Any idea how much water it will carry? Are both rear beds 2 1/2 hose except for the leader length of 1 3/4?
#8 by Michael M on December 5, 2017 - 11:53 AM
It also looks like ladder storage will be fully enclosed. Also looks like the attack lines will come of the back as they usually do. It looks like they will have room for all the normal hose they carry including the 100 ft. of I believe it is 1 and 1/2 inch hose.
#9 by Michael M on December 5, 2017 - 11:50 AM
Looks like it is nearing completion! When is it scheduled for delivery? Later this month or in January?