The Barrington Fire Department in MABAS Division 4 has ordered a new engine from E-ONE. The new unit, which will be very similar to Engine 361, will be built on a Typhoon chassis with a 1,250-GPM pump, a 1,260-gallon water tank, and two 20-gallon foam cells. (so 136838)

Barrington Fire Department E-ONE Typhoon engine

The new engine will look very similar to this 2009 Tradition Series engine on a Typhoon chassis (so 135665). Larry Shapiro photo