The Mt. Prospect Fire Department moved into the new station 14 10 days ago although it comes as no surprise that everything hasn’t yet been completed. The contractor wasted no time in demolishing the old station next door within days of the move. The new station shares the same address as the old station at 2000 E. Kensington. Aside from a punch list of things to do, one of the noticeable areas that needs to be completed are the front bay doors. Currently the doors are solid basic gray steel with no windows. Evidently the finish on the permanent doors has been rejected on two separate occasions. Initially they were removed to be repainted due to an ‘orange peel’ texture to the finish and when they were brought back they never made it off the truck! The permanent doors will have windows in them.

An interesting note about the construction of the station is that it is built to strict standards for sustainability during severe weather. After a storm came through town several years ago and produced a significant amount of damage, it was determined that the north end of town did not have a significant structure that would provide protection to the public in the event that severe weather was imminent. The exact standards to which the building was built were not available when this post was written.

So, these updated photos … will not be the last!

Mount Prospect Fire Station 14

Photo by Larry Shapiro

Mount Prospect Fire Department Staion 14

Photo by Larry Shapiro

Tags: , ,