Posts Tagged Tony Carlini

New TRT squad for the York Center FPD

This from Tony Carlini:

Attached is a new order for the York Center Fire Protection District. It is a Marion Body Works 19’ custom van body with a Ford F-650 chassis  for their technical rescue team. Features include, lumber storage racks for trench rescue,  fin form storage racks, underbelly boxes, a pull-out awning, and additional above cab storage in the box area. This is using Marion Body Works’ Van Body and Custom engineered vehicle line to meet the needs and budget for special response vehicles. It will be delivered spring summer 2021.

Marion Body Works Ford F-650 special duty fire department squad

click to download

Tags: , , , ,

New engine for Sandwich FPD (more)

From Tony Carlini:

600 gallons of water, 2000-gpm Waterous pump, 30 gallons foam, technical rescue equipment, shoring in coffin compartments, light tower, extrication tools, and  2 cord reels

drawing of new fire engine

click on drawing to download a larger file

Tags: , , , , ,

Maywood orders new engine (more)

This from Tony Carlini:

Maywood Engine 507 progress pics. Delivery late August early September.
Spartan Metrostar/Marion Body Works engine

Tony Carlini

fire engine being built for Maywood IL

Tony Carlini photo

fire engine being built for Maywood IL

Tony Carlini photo

fire engine being built for Maywood IL

Tony Carlini photo

Tags: , , , , ,

Maywood orders new engine

This from Tony Carlini:

Maywood Engine 507; Spartan Metrostar, Marion Body Works body, Hale 1,500-gpm pump, and 500-gallon tank. Delivery is expected late August 2016

mechanical drawing of new fire engine

New engine design for Maywood.

Tags: , , , , ,

Palatine orders new squad

This from Bill Friedrich:

Approved at the Palatine City Council earlier this week, the Palatine FD placed an order for a Spartan Gladiator ELFD 20-inch raised roof chassis with a Marion Body Works 20-foot walk-around heavy rescue squad. Delivery is expected in late 2013
Tony Carlini from TC Fire
The old squad will be placed in reserve once the new vehicle arrives and is placed in service.

Tags: , , , ,

New squad for Will County Sheriff

This from Tony Carlini:

Will County Sheriff’s Special Operations Group  ordered the following:

  • Spartan Gladiator ELFD 24” raised roof tandem-axle chassis
  • Marion Body Works 30’ walk-in/walk around body with two command slide outs
  • numerous interior and exterior storage areas
  • monitors, TV, satellite, light tower
  • Delivery late 2013

Tony

Tags: , , , ,